16 July - Construction update
Based on the latest progress report, we are happy to update that the physical process plant and other components are progressively being dispatched and installed. However, our contractors, WS Bioengineering Pte Ltd, are of the view that the process of synchronizing the dispatch and installation of process equipment with that of the construction schedule is part reliant on factors that are beyond their control, such as weather and barge (shipping) schedules. As such, while the completion date of the refinery's building and infrastructure remains achievable, the process equipment's assembly and, hence, the commencement date for the production of refined oils may be affected.
The Board is monitoring the situation very carefully and will advise the market if there is any change to the target date.
Administration Building
Boiler House
Boiler Installation
Storage Tanks & Pipe Racks
Administration Building - Slap in Progress
Wight Bridge 2 - Cantilever Wall Complete
TNB Sub Station
Oil Pit - 80% Complete
May 2010
May 2010
May 2010
Sabah Chief Minister officiating at a joint ground breaking ceremony organized by the POIC
TANK FARM PROGRESS
Tank T201- Top Roof Setting in Preparation
High Pressure Boiler - Footing in Progress
TNB Sub Station- Super Structure in Progress
Received & Despatch Area - Oil-Pit footing
Transfer Pumps
(April) Tank Farm
(April) Tank Farm
(April)-Tank 204 - Top Roof C-Channel in Progress
(April) Tank T203 Heating Coil in Progress
(April) Boiler House- Column Concrete Casting in Progress
Physical Refinery Plant- Deodorizer Footing Complete
ZUREX CORPORATION SDN BHD - PHYSICAL REFINERY PLANT (March 31, 2010)
Tank T203- Top Roof Setting in Preparation
Feb 2010 - Tank Farm - Tank Shell Plate First Layer View
Feb 2010 - Tank Farm - Tank Shell Plate First Layer View
Feb 2010 - Pump House - Rebar and Stump Complete
Picture Mid-February 2010: Physical Refinery Plant - Ground Beam Rebar work complete
Reinforcement Bar inside Form Work (600mm x 300mm)
Cross Over Pipe
Fabrication of Deaerator
Excavator Start to Excavate first row of Refinery Plant
Fabrication of Package Boiler
Fabrication of Gantry Structure
Secondary Clarifier of Waste Water Treatment Plant
Physical Refinery Plant - Form Work & Lean Concrete Work for Each Section
Tank 250MT concreting, total volume of concrete used is 21m³
T401 & T402 Tank Foundation Completed
Tank T204 Centre Reinforcement Bar Work
Tank Farm Overall View
Cornerstone laying ceremony